A can lay a railway track between two stations in 20 days, B can complete the same task in 15 days, and C assists them to finish the job in 5 days. How long would it take for C alone to complete the job?

Questions :

A can lay a railway track between two stations in 20 days, B can complete the same task in 15 days, and C assists them to finish the job in 5 days. How long would it take for C alone to complete the job?

Options :

  •  8 days
  •  10 days
  •  12 days
  •  13 days

correct answer : c)

Explanation :

A’s work rate = 1/20

B’s work rate = 1/15

(A + B + C)’s combined work rate = 1/5

C’s work rate = 1/5 − (1/20 + 1/15)

= 1/5 − 7/60

= 12/60 − 7/60

= 5/60

= 1/12

Therefore, the time taken by C alone to complete the work = 1 ÷ (1/12) = 12 days.

Hence, the correct answer is option (c) 12 days. The options 8 days, 10 days, and 13 days are incorrect because C’s individual work rate is 1/12 of the work per day, which means C requires exactly 12 days to complete the entire job alone.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top